London Underground Power Upgrade Package 10

22kV cable route design to power a section of Crossrail.

  • Date: 2014 to 2016
  • Client: J. Murphy & Sons
  • Project Type: Design 

About this Project

The detailed design of approximately 10km of cable route including 22kV feeders and associated fibre route. We provided design of a cable route management system, structure gauging for a cable bridge over a Road-Rail-Vehicle Access Point, Under Track Crossings (UTXs) and several Over Track Crossings (OTXs).